Granite / Sourcing guide

A natural stone sample approval workflow for project buyers

Treat sample approval as a recorded project decision with a defined scope. The designer, purchaser, supplier and receiving inspector should be able to identify the same references and understand what was accepted. The workflow below can be adapted to granite, marble or limestone, with the required sample scale and technical checks agreed for the actual application.

Decide what each sample is meant to establish

Stone Federation GB distinguishes small indicative samples from larger control or range samples that show the expected spread of geological features. Its published guide discusses this distinction for cladding. For purchasing, use clearly named sample purposes rather than letting a single sample stand for every approval.

Create separate entries for initial color selection, proposed appearance range, finished edge or detail, and any assembly mockup. Specify who must review each item and which decision it supports. A sample accepted for an edge profile should not automatically become the reference for the entire shipment’s color distribution.

Source: Stone Federation GB: A Guide to BS 8298 (2013), indicative and control samples

Build a register before the review meeting

Assign each sample a permanent ID. Record the supplier, stated stone identity, stated source or lot where available, finish, dimensions, treatments disclosed and date received. Link the corresponding photographs and shipment note. Ask the supplier to explain whether the set represents material currently proposed for the order or is a general selection reference.

Include a field for unresolved questions. For example, a finish may be acceptable while the proposed range remains undecided, or the reviewer may request a larger layout before assessing directional markings. Keep these as separate decisions. Avoid a single approved checkbox that conceals a condition attached to one part of the review.

Review appearance in an agreed setting

Agree the lighting, viewing orientation and sample arrangement with the project reviewer before approval. Identify typical pieces and proposed limits, then write down any features that need closer discussion. For adjacent rooms or elevations, ask whether the same selection range should continue throughout or whether distinct zones may be approved separately.

Use photographs to document the review, with sample IDs visible and any wet or dry condition stated. Keep the accepted physical references in a known location. Record whether the team reviewed individual pieces, a grouped range or a mockup, and list the neighboring finishes considered. These details make a later comparison easier to reproduce.

Record a decision that the supplier can act on

Use explicit statuses such as accepted for appearance, revise and resubmit, or pending technical review. Describe the scope in words: finish only, specified range, particular slab selection or a named detail. Record the reviewer, date, conditions and references. Ask the supplier to acknowledge the same decision record before it becomes part of the order documents.

Add a change rule. If a proposed stone source, batch, finish or treatment changes, require the supplier to flag it against the approved record. Let the responsible reviewer decide what must be resubmitted. Record an agreed approval milestone for production instead of assuming that delivery of a sample is permission to proceed.

DecisionWhat the record should identify
Appearance reviewSample IDs, viewing conditions and accepted range
Technical reviewRequired evidence and responsible reviewer
Production releaseApproved revisions and outstanding holds

Carry the reference through inspection and receiving

Link sample IDs to the order lines and inspection brief. Ask the inspector to record which retained set was used, which pieces were examined and any proposed departure. Keep a clear route for questions that cannot be resolved from photographs. Do not ask an inspector to invent acceptance limits after the shipment is complete.

At handover, give the receiving team the current register, approved references and open conditions. Identify who will keep the physical samples for later replacements or extensions. If an additional order is placed, review the new proposal against those references and document the outcome; do not silently reuse an approval that covered a different supply.

Does accepting a sample mean that production can begin?

Only if the agreed order process says so and all required release conditions have been met. State whether the decision approves appearance, a detail or production itself. Keep outstanding drawings, technical evidence and commercial conditions visible until their responsible reviewers close them.

Sources & further reading

External references support attributed material facts and provide further context. The purchasing checklists are BZStone editorial guidance; they are not supplier commitments or installation designs.

Continue with granite.

Category overview ↗

From reading to a clear request

Bring the details.
Shape the brief.

Gather the intended use, actual material references, dimensions, quantity and destination. Keep unknowns visible so they can be resolved before approval.

Prepare a sourcing brief