BZSTONE | RFQ & QUOTE COMPARISON WORKSHEET Version: 2026-11-27 | https://bzstone.com/guides HOW TO USE Copy this blank worksheet for each quotation. Send the same revision to each supplier. Mark unknowns as OPEN; a blank or excluded cost is not zero. This is a preparation aid, not a quotation or a contract. Confirm commercial terms with the parties before ordering. Do not include passwords or payment details. 1. COMMON BUYER BRIEF Project / buyer reference: Brief revision / date: Intended use and installation environment: Destination country / delivery location: Requested arrival window (subject to supplier confirmation): Responsible buyer / technical approver: 2. ITEM RECORD (duplicate for each item) Buyer item ID / drawing revision: Material identity / supplier trade name / source if substantiated: Actual sample / slab / specimen / batch ID and photo reference: Reference image only? YES / NO / OPEN: Dimensions L x W x T and unit: Finish / visible faces / edge / holes / backing / accessories: Quantity and unit (piece / set / m2 / tonne / other): Net installed quantity versus ordered quantity: Cutting allowance / spare quantity and who calculates it: Permitted variation / tolerances / acceptance record: Treatment / filling / repair disclosure: Test or use-specific evidence requested and reviewer: For minerals: natural/synthetic status; treatment; exact piece or assortment: 3. QUOTATION RESPONSE (one record per supplier and revision) Supplier / quote reference / date / validity: Matched brief revision: Currency / unit price / pricing unit / quoted quantity: Material amount: Fabrication / finishing / accessories (included or separate): Samples / tests / approval costs: Packing / pallets or crates / gross weight / dimensions: Origin transport / freight / insurance (scope and payer): Destination charges / customs taxes / delivery / unloading (scope and payer): Trade term, named place and edition if proposed: Payment milestones / production trigger / dispatch window: Partial shipments / replacements / claim procedure: Exclusions / assumptions / alternative material offered: Open items with owner and response date: 4. NORMALIZE BEFORE COMPARING Are material identity, finish, dimensions and quantity units identical? Are quotation dates, currencies and delivery scopes comparable? Are cutting waste, spares and packaging treated on the same basis? Have unmatched costs been obtained rather than treated as zero? Have substitutions and unapproved assumptions been separated? Comparison conclusion and supporting calculation reference: Selection is pending until these unresolved items are confirmed: RELATED GUIDES https://bzstone.com/guides/granite-quote-comparison https://bzstone.com/contact