BZSTONE | SHIPMENT & ARRIVAL INSPECTION RECORD Version: 2026-11-27 | https://bzstone.com/guides HOW TO USE Agree this record with the supplier before dispatch. Use it to connect the order, packing list and observations. It does not define legal claim periods or certify a lifting method. Arrange competent handling and confirm the carrier/supplier notification procedure before delivery. 1. SHIPMENT IDENTITY Order / supplier / shipment reference: Packing-list revision / date: Destination / delivery appointment / receiving contact: Container or carrier reference / seal if applicable: Delivery and unloading responsibilities agreed with: Known access, storage and handling constraints: 2. PACK RECORD (duplicate for each crate or carton) Pack ID / item IDs / actual piece or batch photo references: Quantity and unit / set components: Gross weight / external dimensions / confirmed handling information: Packing type / cushioning / separators / base protection: Pre-dispatch photos (all relevant sides, interior before closing, labels): Required timber-packaging evidence, when applicable, reviewed by: Packing-list match / open discrepancies: Supplier release / buyer review / date: 3. ARRIVAL OBSERVATIONS Arrival date/time / receiver / delivery document reference: External condition before opening / photo filenames: Pack IDs and counts checked: Observed wetting, impact, puncture, movement or missing labels: Carrier remarks / acknowledgement if obtainable: Safe unpacking arrangement / responsible person: 4. ITEM INSPECTION (duplicate for each discrepancy) Pack ID / item ID / ordered and received quantities: Condition / dimensions / finish / accessories checked against revision: Sample, exact-piece or agreed assortment record used for comparison: Observed issue (describe; do not assume cause): Photos with scale / all sides / packaging retained location: Affected quantity / separated items / location: Supplier and carrier notification date / case reference: Agreed action / owner / due date / closure evidence: 5. CLOSE THE RECORD Items accepted / held / pending review: Replacement or other resolution confirmed in writing: Final quantity reconciliation / sign-off / date: Records retained at: For the relevant workflow, use the mixed-order shipment guide in the BZStone sourcing library: https://bzstone.com/guides Contact: https://bzstone.com/contact