Granite / Sourcing guide

How to compare granite quotations on the same scope

A granite quotation is easier to assess when every offer answers the same purchasing brief. Start with a comparison sheet that keeps the supplier’s original wording beside your normalized fields. Mark unanswered items as open. This guide proposes a practical review process for slabs, paving and fabricated components; it does not set a market price or promise a supply condition.

Freeze one brief before requesting a comparison

Give the inquiry a reference and revision. Record the stone name and offered source, application, finish, thickness, piece schedule and destination. Separate the requested material from any proposed alternative. Ask each respondent to identify every departure from the brief in one place, including a different finish, selection range or quantity basis.

Use a common response deadline for your own comparison, while asking each supplier to state its actual quotation validity. Save the drawing and sample references sent with that revision. If the quantity changes during negotiation, issue the change to all offers still under consideration before comparing their totals.

Make the quantity and price unit explicit

Create separate fields for the quoted unit, measured quantity and included operations. For slabs, ask whether the measurement is gross slab area, a stated usable area or another agreed basis. For finished pieces, reconcile quantities with the piece schedule. List edge work, holes, grooves, matching and spares separately if they are priced separately.

Consider a hypothetical comparison: one offer includes finished pieces and protected crates, while another covers only sawn blanks. Neither total can answer the same procurement question until the missing work is priced. Ask for written additions; do not insert an assumed allowance that makes an incomplete quotation appear complete.

Check what the commercial scope actually includes

Give packaging, loading, inland transport, export handling, international carriage, insurance and destination handling their own rows. Record the proposed delivery term, named location and rule edition where used, then ask the parties to confirm the actual responsibility split. Keep destination duties and taxes as open items until the responsible import adviser has confirmed them for the actual shipment.

Also record payment milestones, inspection arrangements, sample charges, change procedures and the proposed remedy for a nonconforming item. Ask who bears agreed rework or replacement costs and how any replacement shipment would be handled. An offer with these questions unresolved should remain conditional in the comparison sheet.

Comparison rowRecord before comparing
Material and workSame identity, finish, dimensions and included fabrication
Price basisCurrency, rate unit, measured quantity and quote validity
Packing and transportIncluded stages, named location, exclusions and responsible party
Unpriced itemsWritten clarification or an OPEN status; never a zero-cost assumption

Compare the evidence included with the offer

The Natural Stone Institute distinguishes testing needs according to the intended use and advises reviewing required test information for the proposed stone. A generic reference to an industry standard is therefore a prompt to request the relevant documentation, rather than a complete material approval.

In your comparison, give each required report or sample its own status: supplied, requested, under review or accepted by the named reviewer. Record which offered material the evidence describes. Keep visual approval, technical review and commercial acceptance as separate decisions so that an attractive sample does not silently close an unrelated evidence gap.

Source: Natural Stone Institute: ASTM International Standards

Close the differences before issuing the order

Prepare a final clarification list with an owner for every open row. Ask the selected supplier to incorporate accepted clarifications into one revised quotation or acknowledged order schedule. Retain the earlier offers as history, but make the current revision easy to identify. Avoid relying on a mixture of old PDFs and later chat messages.

Your final review should explain why the offer was selected: comparable scope, accepted exceptions and remaining conditions. If a material substitution or drawing revision arrives afterward, reopen only the affected comparison rows and obtain the relevant approvals again. Keep the decision record with the purchase documents for the receiving team.

Can I compare granite offers using price per square metre alone?

Use that figure only after confirming the same measurement basis, material selection, thickness, finish and included work. Preserve a separate list of exclusions and unresolved costs. The useful comparison is the agreed delivered scope, with its conditions visible.

Sources & further reading

External references support attributed material facts and provide further context. The purchasing checklists are BZStone editorial guidance; they are not supplier commitments or installation designs.

Continue with granite.

Category overview ↗

From reading to a clear request

Bring the details.
Shape the brief.

Gather the intended use, actual material references, dimensions, quantity and destination. Keep unknowns visible so they can be resolved before approval.

Prepare a sourcing brief